Reliable Brokers
Online Investing
Alerts & Analysis
Easy Trading

Petrofac up 60% on 13 billion Hitachi deal - more to come?

Petrofac shares have risen 60% in London this morning on the announcement of a 13 billion deal with Hitachi. But that is the size of the total deal, not Petrofac’s share

Update : 30 Mar 2023, 03:49 PM

Petrofac (LON: PFC) (OTCPK: POFCF) shares are up 60% early this morning in London as the company announces the clinching of a deal alongside Hitachi. The headline claim is of a “13 billion” deal which is indeed the size of the entire framework but isn't the revenue - and certainly not the profit - that's going to accrue to Petrofac. A little more consideration than just a concentration upon that headline 13 billion figure is therefore required.

The point to grasp here is that Petrofac is an energy services company. That means it designs, builds, maintains, energy infrastructure and here the importance is that a lot of that work over the years has been offshore. So, the people who build rigs and pipelines tend to be the people who know how to do engineering out at sea. Given the expansion of offshore wind this is therefore giving a second wind (sorry) to those engineering companies who know how to do this difficult job. That's what this framework with Hitachi is all about.

Petrofac share price from London Stock Exchange

We can read the details of the Petrofac/Hitachi announcement. “Petrofac and Hitachi energy secure landmark offshore wind framework worth approximately 13 billion euros” and there's that 13 billion again.

The framework itself is a series of likely contracts with TenneT, the Dutch-German transmission operator. The work is to bring ashore the power being generated by the new and planned offshore wind farms. Without being too, too, detailed Hitachi will be supplying the kit, Petrofac doing the work.

This is undoubtedly Petrofac's largest ever deal. But it's worth realizing that this is the framework. That framework consisting of 6 contracts in series, only one of which is to start right now. We can assume that the awarding of the subsequent parts of the framework will depend upon the success of the earlier parts. That is, in order to gain the full value it is actually necessary to perform the early parts of the contract to specification.

Yes, it is transformative. But there's also a certain wariness given the difficulty so many have in actually performing, on time and to cost, large scale engineering contracts.

Top Brokers