Reliable Brokers
Online Investing
Alerts & Analysis
Easy Trading

Dredging of Kirtankhola River starts

Update : 15 Sep 2013, 03:39 PM

Barisal river port authority has started dredging of river Kirtankhola on Sunday to improve the navigability of the river route.

The authority said they have started this dredging ahead of Eid-ul-Azhah to tackle the upcoming Eid rush by keeping the river route prepared for moving the vessels smoothly. 

By using one of the dredgers of BIWTA the dredging started around 1pm.

Md Shahidullah, deputy director Bangladesh Inland Water Transport Authourity, said this is the beginning of a three phase dredging at Barisal river port and adjacent areas.

The first phase of dredging will continue till October 8 to remove 40 thousand cubic meter silt to maintain smooth and safe navigation during the Eid rush, the deputy director said.

In three phases total 150 thousand cubic meter silts would be removed. The dredged silts would be dumped on the erosion affected sites as there is no place for dumping the silts, the port officer added.

BIWTA and BIWTC officials said they suggested sustainable capital dredging following a hydrological survey on 22 points fewer than 6 routes of 1,100 kilometer long regional routes for ensuring safe and smooth navigation in Barisal region.

According to the leaders of water transport owners and crews associations, the siltation and under water shoals endangering regional river routes connecting Dhaka-Chittagong-Mongla.

However Saidur Rahman Rintu, vice president of Barisal launch owners association and president of Barisal Chamber of Commerce and Industries, said without any master   plan, hydrological and hydro-geographical survey, and any model study capital dredging will give a temporary solution, but would be failed to give any long term sustainable positive result.

Top Brokers