Awami League General Secretary Obaidul Quader has said that Bangladesh is now in a state of maximum alert given the airstrikes launched by the Myanmar junta inside Bangladesh territory and that the country is observing the situation with grave concern.
“Bangladesh wants peace, not war,” he said while visiting the Kalna Bridge, constructed on the Modhumoti River in Kashiani Upazila of Gopalganj on Thursday.
Quader, who is the road transport and bridges minister, said that the prime minister has said that Bangladesh will not engage in any war. However, the border force, BGB, along with the Bangladesh army is ready to defend the country’s territory.
“We will take the matter to the UN if necessary,” the minister said, adding that the government intends to resolve the problem through discussions.
He hoped that the premier will raise the matter during her address at the UN General Assembly today.
“Now is not a time for war. The entire world is facing an energy crisis. The entire world is facing instability,” Quader said.
On a different note, he said the BNP, which is dreaming of a caretaker government in broad daylight, will never have its aim materialise.
“The BNP is dreaming in broad daylight of a re-installation of the interim government provision in the constitution; its dream will never be fulfilled,” he said.
“There is no possibility of a return to the provision as the system now has been abandoned and kept in the museum after the directives coming from the higher judiciary,” said Quader.
Quader accused the BNP of creating a controversy over the elections and said the next elections will take place at the proper time as per the constitution.
Terming the development of roads and highways unprecedented, he said a huge number of roads and highways had been developed during the tenure of the present government. “Four-lane and six -lane roads will be constructed based on necessity,” he was quoted as saying by the BSS.
The Kalna Bridge will be inaugurated next month, but a confirmed date will be announced after the return of the prime minister from abroad, Quader said. He added that the summary of the bridge has already been sent to the Prime Minister’s Office and she has signed it.
The newly-constructed 690 metre long and 27.10 metre wide bridge has been constructed under a cross border improvement project at a cost of Tk959.85 crore.