300km highways under repair in Rajshahi

The repairs of 300 kilometres of run-down highways have started at a quick pace in Rajshahi division so that people who are headed home for Eid-ul-Fitr can have smoother journeys.

The repair work in Rajshahi, Chapainawabganj, Naogaon, Pabna, Sirajganj and Natore will end well before Eid, said Additional Chief Engineer Abdus Salam at Rajshahi Roads and Highways Department yesterday.

According to the divisional roads and highways office, potholes and the damaged edges of the highways are being repaired on priority basis because they are the main reasons for road accidents and bumpy rides.

Seeking anonymity, an assistant engineer at the Rajshahi roads and highways office said: “The conditions of the roads in Rajshahi are better than those elsewhere in the country.”

Potholes develop on the highways because of heavy downpours during the rainy season and such potholes have developed at quite a number of places, including Binodpur and Katakhali in Rajshahi city.

Drivers face much difficulty when driving through Binodpur and Katakhali because lots of potholes have formed on the highways, causing immense suffering for passers-by and shop owners whose businesses are located along the highways.

Dirt turns into mud when it rains and if a someone drives fast on the highways there, the passers-by get splashed with muddy water.

A betel leaf vendor, Saban Ali, who is from Kajla in the city, said transportation becomes difficult because of potholes on the highway. In most cases, drivers cannot pinpoint a pothole when driving through the highway during the rain and get stuck in the potholes. 

Additional Divisional Chief Engineer Abdus Salam, however, said: “All the highways in the division will be repaired well before Eid and for that we have kept all the materials, including bitumin and stones, in store.”