The Dhaka-Chittagong Highway is going to get three four-lane bridges over the Shitalakkhya, Meghna and Gomati Rivers, with the financial assistance of Japan International Cooperation Agency (Jica).
Road Transport and Bridges Minister Obaidul Quader told reporters about the massive project at a press briefing at the Secretariat yesterday around 10:30am.
The bridges will be constructed near the existing bridges, which will be repaired as well, the minister said.
“Around Tk8,500 crore is estimated to be the cost to run feasibility tests and appoint consultants for the construction of the new bridges, supervision and renovation of the old bridges and construction of a flyover and intersection at Kaachpur,” he told the reporters.
“Of the estimated cost, Tk6,500 crore will be provided by Jica, and the rest will be paid by the government. The feasibility tests, appointment of consultants and designs are already done,” he added.
International tender was floated on Tuesday for the three bridges, and the deadline for tender submission for the project is on April 27, the minister said.
Work order for the bridge construction will be given in September, and the minister hopes that the construction can start off by November.
Asked about the ongoing violent attacks on vehicles on the highways during the 20-party-imposed blockade, the minister said: “The transport situation has indeed been much troubling due to the continuous arson and bomb attacks in the name of blockade, as well as the vandalism of the vehicles.
“We are trying to keep the highways safe by enforcing extra security and urge the transport owners to run their vehicles on the highways.”
He said: “No matter how much violence is inflicted on us, construction of mega projects such as Padma Bridge and Metro Rail will not be stopped.”
Among others, the press briefing was attended by MAN Siddique, secretary at the Road Transport and Highways Division, and Md Feroz Iqbal, chief engineer at the Roads and Highways Department.