Flood situation worsens in Brahmaputra basin

The flood situation in the Brahmaputra River basin, including on chars of four upazilas of Gaibandha, deteriorated further as the water level of the river increased during the 24 hours to 9am on Wednesday due to incessant rainfall and onrush of hilly waters from the upstream.

Bangladesh Water Development Board (BWDB) officials said the water level of the Brahmaputra River increased by 2cm during the period and the river is flowing 13cm above its danger mark at the Fulchharighat point of the district.

As a result, the chars located on the eastern sides of the river basin areas of Sundarganj, Gaibandha Sadar, Fulchhari and Shaghata upazilas of the district have been inundated and many char people have been marooned and are passing their days and nights miserably.

The low-lying areas located on the western sides of the river have also been flooded.

Md Matiar Rahman, chairman of Kamarjani union parishad, said with the rise of water level in the river, erosion has taken serious turn at different points of the union, and that hundreds of houses in the union have gone under flood water causing untold sufferings to the flood victims.

Nezarat Deputy Collector SM Foyez Uddin, who is discharging his duty as district relief and rehabilitation officer in addition to his post, said over 40,000 people of the flood-affected areas have been marooned.


Also Read



In reply to a query, he said a total of 80 tons of rice and Tk6 lakh have been allocated for the flood victims of the district.

Due to the flood, a total of 111 primary schools of the district have been closed and academic activities of the schools have also been stopped, said District Primary Education Officer Mohammad Hossain Ali.

Besides, 35 high schools have also been closed due to inundation, said an official.

Belal Uddin, deputy director of the Department of Agricultural Extension, said standing crops on 1324 hectares of land located in the chars and Brahmaputra river basins have gone under flood water.

On the other hand, the water level of the Ghagot River also increased by 5cm during the period and the river is flowing 42cm above its danger level at Newbridge Road point of the district.

Executive Engineer of the BWDB Abu Raihan said leakage and broken parts were also found at different spots of the flood control embankment and maintenance works are being done at the vulnerable points of the embankment in through filling up earth and sand bags on urgent basis.

As the Brahmaputra is flowing over its danger mark, the officials and the employees of the board have been kept alert and vigil there to protect the embankment from any kind of damage.

Superintendent of Police Muhammad Towhidul Islam said police patrolling by engine driven boats have been intensified in the Brahmaputra River to check piracy in the chars and western sides of the river.

Talking to the BSS, Deputy Commissioner (DC) Oliur Rahman said the district and the upazila administrations have got ready with relief materials and manpower to address the flood situation in the district efficiently. 

Meanwhile, relief materials have already been distributed to 400 flood victims of Kamarjani union of Sadar upazila at the direction of the district administration.

They were also monitoring the situation closely and briefing the higher authorities concerned about the latest situation and its doings about flood.

The district administration is actively considering opening a control room to help inform the people about floods, the DC said.