• Monday, Dec 06, 2021
  • Last Update : 10:03 pm

Are plastic roads cost-effective for Bangladesh?

  • Published at 02:45 am December 3rd, 2016
  • Last updated at 06:28 pm December 3rd, 2016
Are plastic roads cost-effective for Bangladesh?
Generally, the cost would vary depending on the process that would be used to construct the plastic roads. Shamsul Hoque, professor of at the department of civil engineering in Buet, said: "There are mainly two methods to construct plastic roads – wet process and dry process. If the wet process is used, it would increase the construction cost, but the dry process would typically reduce it." In the dry process, waste plastic is mixed with construction aggregates in equal proportions and then with hot bitumen. The plastic is shredded and heated to 165 degrees Celsius before transferring to a mixing chamber with aggregates. Later, bitumen heated at 160 degrees Celsius is transferred to the chamber and mixed, he explained. “This process should be cost-effective as use of stones would be reduced in road construction,” he added.
Also read - The next step in road infrastructure? | Will it save the environment? | New material will extend runway life by 40 years
How the plastic is processed Explaining the wet process, Shamsul said: “The wet process is very simple and also smooth for road construction. Nowadays, there are many industries in the country that sell liquid plastic that can be mixed with bitumen. We would only need a plant with machines to mix the two materials. “However, liquid plastic is more expensive than shredded plastic. The cost would increase more if the liquid plastic was imported.” The Indian government has recently used the dry technology to construct highways which is expected to reduce construction cost by 50%. But Bangladeshi experts have suggested using the wet process because it is easy and also makes roads more durable. Stating some of the limitations, Shamsul said it would be difficult to collect waste plastic in one place to manage the whole process. Moreover, if the wet process was used, big investments and equipment would be needed to carry out the construction.
52
Facebook 50
blogger sharing button blogger
buffer sharing button buffer
diaspora sharing button diaspora
digg sharing button digg
douban sharing button douban
email sharing button email
evernote sharing button evernote
flipboard sharing button flipboard
pocket sharing button getpocket
github sharing button github
gmail sharing button gmail
googlebookmarks sharing button googlebookmarks
hackernews sharing button hackernews
instapaper sharing button instapaper
line sharing button line
linkedin sharing button linkedin
livejournal sharing button livejournal
mailru sharing button mailru
medium sharing button medium
meneame sharing button meneame
messenger sharing button messenger
odnoklassniki sharing button odnoklassniki
pinterest sharing button pinterest
print sharing button print
qzone sharing button qzone
reddit sharing button reddit
refind sharing button refind
renren sharing button renren
skype sharing button skype
snapchat sharing button snapchat
surfingbird sharing button surfingbird
telegram sharing button telegram
tumblr sharing button tumblr
twitter sharing button twitter
vk sharing button vk
wechat sharing button wechat
weibo sharing button weibo
whatsapp sharing button whatsapp
wordpress sharing button wordpress
xing sharing button xing
yahoomail sharing button yahoomail