• Tuesday, Sep 29, 2020
  • Last Update : 12:20 am
13km tailback on Dhaka-Chittagong...

13km tailback on Dhaka-Chittagong...

Bangladesh

Fri, Sep 9 2016

The Dhaka-Chittagong highway has been experiencing a 13km tailback on Munshiganj's Gazaria part owing...

Section 144 imposed in Munshiganj...

Section 144 imposed in Munshiganj...

Bangladesh

Thu, Sep 1 2016

Sreenagar upazila authorities have imposed Section 144 in the local town to shun possible clash as two...

Main structure of Padma Bridge to be...

Main structure of Padma Bridge to be...

Bangladesh

Thu, Aug 4 2016

Road Transport and Bridges Minister Obaidul Quader said main structure of the Padma Bridge would be...

9km tailback on Dhaka-Ctg highway

9km tailback on Dhaka-Ctg highway

Bangladesh

Fri, Jul 1 2016

A 9km tailback has appeared on the Dhaka-Chittagong Highway under Gazaria upazila of Munshiganj district...

Water level falling by 3-4cm in Padma...

Water level falling by 3-4cm in Padma...

Uncategorized

Sat, Feb 7 2015

The water level in the Padma river has declined drastically causing severe navigability problem on ...